Skip to main content

Who is liable for a pothole or broken sidewalk in New York?

If a pothole or broken sidewalk injured you, first identify who maintained the exact spot. Many New York municipalities require a written record of that defect before the accident. In New York City, Administrative Code § 7-201(c)(2) governs claims against the City, while § 7-210 generally makes the adjoining property owner responsible for an unsafe sidewalk. If you have a claim against a municipality, you generally have 90 days after the injury to serve your own notice of claim.

Who was responsible for the spot where I fell?

Start with the surface your foot or wheel struck. A broken sidewalk slab outside a store, a hole in the crosswalk beside it and a loose utility cover at the corner can involve different defendants. Mark the spot on a photo that includes the address or intersection. Identify the street owner, the adjoining parcel and anyone who opened or patched the pavement there. A street-opening permit can identify the contractor whose work records to request.

In the five boroughs, § 7-210 generally makes the abutting owner liable when its failure to maintain a sidewalk with reasonable care causes injury. The residential exemption covers one-, two- and three-family properties only when the owner lives in at least part of the property and the entire property is used exclusively as a residence. A downstairs storefront matters even if the owner lives upstairs. Where the exemption applies, the City retains its previous liability, subject to its notice law. An exempt owner can still face a claim for creating the hazard. See the guide to abutting owners under § 7-210 and the 2018 Hernandez decision.

What counts as prior written notice of a New York City pothole?

Section 7-201(c)(2) gives an injured person three kinds of records to look for. Each must identify the condition that caused the injury. The law gives the City 15 days after receipt to repair or remove the danger or otherwise make the location reasonably safe. NYC Administrative Code § 7-201(c)(2)–(4)

A written defect report delivered to the right office
Look for a dated writing received by the transportation commissioner or a person or department the commissioner authorized. The Department of Transportation (DOT) keeps an indexed public record of notices. Request the entry and the underlying report. A complaint about a hole across the street can send a crew to a different spot.
Written notice of an earlier injury from the same defect
If the same hole had already injured someone or damaged property, look for written notice of that earlier injury given to a city agency. A neighbor who remembers the incident may be able to identify the person who reported it.
The City’s own written acknowledgment
Ask for inspection reports and work orders from the agency responsible for repairs. In Bruni, a call prompted an inspection. The sewer supervisor’s written findings, drawing and repair order showed that he had seen the hole and recognized the danger.

How can I tell whether a Big Apple map recorded this defect?

The Big Apple Pothole and Sidewalk Protection Corporation submitted maps to DOT with symbols marking hazards. Ask for the sheet covering your block as of the accident, its key, its delivery date and any replacement sheet filed before your injury. In Katz, the old sheet marked a defect and the newer survey showed none at that spot. The newer survey controlled on those facts.

Place the map beside your photograph. Find the correct side of the street and the slab, grate or crosswalk where the injury occurred. Then read the mark against the key. In D’Onofrio, a straight line identified uneven pavement where the pedestrian described a shifting grate. In Melendez, the claimant found a dotted line at a Queens intersection, but the key assigned it no meaning. In both cases the map failed to establish notice. You can request the maps, notices, inspection reports and street-opening records through NYC DOT’s records office.

Does it matter if residents called or the road crew saw the hole?

Read the law for that city, town or village. It defines which surfaces it covers and who must receive notice. In Amabile v City of Buffalo, evidence that a broken signpost had stood for months could not replace the written notice Buffalo required. In Gorman, a written complaint reached the Huntington department that handled repairs. The town code designated two other officials to receive it.

Keep the text, timestamp, recipient and tracking number of an electronic complaint. In Calabrese, Albany used one electronic system to log complaints and dispatch repairs, and reports submitted through it could qualify. For an NYC 311 call, trace what was recorded, where it went, and whether an inspector later acknowledged this defect in writing. A call number alone tells you little about those facts.

When can a claim proceed without prior written notice?

The municipality’s negligent work immediately created the danger
Find out who did the work, when the crew left and what the pavement looked like then. A crew that leaves an open hole presents a different case from a patch that breaks apart over several winters. In Yarborough, a photograph taken after the fall helped an engineer explain how the patch deteriorated. It did not establish that the injury-causing pothole existed when the crew finished.
A special use benefited the municipality and was connected to the defect
Identify the particular benefit the locality derived beyond ordinary public use, then connect that use to the hazard. In De La Reguera, Mount Vernon collected fees for parking permits. The injured permit holder still needed evidence connecting that use to the pothole where she fell.

Photographs taken as a crew left, a witness who crossed the fresh patch, and daily work logs can help establish when the danger arose. Keep the original photos and the date of each. For a roadway injury, the firm’s Long Island pothole injury page covers evidence to preserve after a crash.

What do I need to do within 90 days of my injury?

Serve a sworn notice of claim on the proper public entity using an authorized method. Give the date, time and place, explain how the injury happened and describe the injuries or losses as far as you know them. Identify the particular hole or slab precisely enough that an investigator can find it. The 90 days generally run from the accident in a personal injury claim. In a wrongful-death claim they run from appointment of the estate representative. For a claim against New York City, the Comptroller accepts electronic notices. General Municipal Law § 50-e · NYC Comptroller’s eClaim filing instructions

Serve the notice while you pursue the map and repair records. A records request leaves the 90-day clock running. Section 50-e(4) also preserves local rules requiring notice of the defect before the injury. Keep proof of service. For an ordinary negligence injury claim against a city, town or village, the lawsuit generally must begin within one year and 90 days of the accident. If the first deadline has passed, court permission for late notice is time-limited and discretionary. General Municipal Law § 50-i · Notice of claim, late applications and the municipal hearing

Which New York decisions explain pothole and sidewalk claims?

  1. Katz v City of New York

    · New York Court of Appeals · 87 NY2d 241

    An older map marked a defect on Second Avenue. A later survey of the same block, filed before the fall, showed none at the accident site. The Court held that the City could rely on the later survey and upheld dismissal.

    Not checked against later decisions.

  2. Amabile v City of Buffalo

    · New York Court of Appeals · 93 NY2d 471

    A pedestrian fell where part of a stop-sign post protruded from the pavement. Evidence that the condition had been there for months could support an inference that workers should have seen it. That inference could not satisfy Buffalo’s written notice law.

    Followed by De La Reguera v City of Mount Vernon on the two recognized exceptions to a municipal written notice requirement.

    Archive note published

  3. Bruni v City of New York

    · New York Court of Appeals · 2 NY3d 319

    A sewer supervisor inspected a damaged catch basin, documented the hole and ordered repairs. His records showed that the agency charged with fixing it knew firsthand that it was dangerous. They qualified as the City’s written acknowledgment.

    Not checked against later decisions.

  4. Yarborough v City of New York

    · New York Court of Appeals · 10 NY3d 726

    A pedestrian tripped in a Brooklyn pothole. His engineer explained how water and wear could have caused an earlier patch to fail. That account left a gap in the proof of what the crew had created when it finished the job.

    Followed by Matos-Matos v City of Yonkers on the requirement that municipal work immediately create the dangerous condition.

    Archive note published

  5. D’Onofrio v City of New York

    · New York Court of Appeals · 11 NY3d 581

    A map marked uneven pavement where the pedestrian described a moving grate and broken cement. In the companion appeal, the pedestrian described a raised sidewalk but the symbol was indecipherable. The City prevailed in both cases.

    Followed by Melendez v City of New York on the use of coded Big Apple map symbols to identify defects reported to the City.

  6. Gorman v Town of Huntington

    · New York Court of Appeals · 12 NY3d 275

    Huntington’s engineering department received a written sidewalk complaint. Although the department handled repairs, the local law designated the town clerk or highway superintendent to receive notice. Delivery to engineering did not satisfy it.

    Not checked against later decisions.

  7. De La Reguera v City of Mount Vernon

    · Appellate Division, Second Department · 74 AD3d 1127

    A permit holder tripped in a city parking lot. The City collected a fee for the space, but the evidence did not connect issuing permits to the pothole. The special-use theory failed.

    Not checked against later decisions.

  8. Hernandez v Ortiz

    · Appellate Division, First Department · 165 AD3d 559

    The homeowner testified that she lived in the one-family house beside the uneven sidewalk. That testimony supported the residential exemption. The pedestrian offered no contrary evidence, and the court dismissed the claim against the homeowner.

    Not checked against later decisions.

    Archive note published

  9. Calabrese v City of Albany

    · New York Court of Appeals · 43 NY3d 167

    After a motorcyclist was injured, Albany challenged notice of a road defect. The city used one electronic system to receive, track and act on complaints. Reports submitted through that system could count as writings delivered to the designated official. A jury question remained about notice of this defect.

    Not checked against later decisions.

  10. Matos-Matos v City of Yonkers

    · Appellate Division, Second Department · 2026 NY Slip Op 06293

    A pedestrian tripped on a plank beside a sidewalk tree well. Yonkers showed it had received no written notice. The record did not show an immediate hazard when the plank went in or when the City removed the tree. The court dismissed the claim against Yonkers.

    Not checked against later decisions.

    Archive note published

  11. Melendez v City of New York

    · Appellate Division, Second Department · 2026 NY Slip Op 06294

    A pedestrian caught his foot in a hole in a Queens crosswalk. The dotted line he pointed to on the map matched no defect in the key, and the other marks identified different conditions. The City obtained dismissal.

    Not checked against later decisions.

    Archive note published

Sources checked November 26, 2026. The November 2026 NYC Code includes § 7-201 and § 7-210. The Senate lists as the current text revision for § 50-e and § 50-i.

Injured? Don't Wait.

Get Your Free Case Review Today

No fees unless we win — available 24/7 for emergencies.

Free Consultation Free Case Review